![]() ![]() Due to the field being practically at street level, the original upper deck made the park look like a cookie-cutter stadium from the outside. The first row of seats in the upper deck of the new stadium is as far from the field as the highest row of seats in the upper deck at the old stadium. While it gave nearly every seat in the upper level an unobstructed view of the field, it also created one of the highest upper decks in baseball. With this in mind, the upper deck was set back over the lower deck, and the stands rose fairly gradually. The original architect, HOK Sport (now Populous), wanted to eliminate the overhang problems present in many stadiums built since the 1970s. ![]() The original field dimensions and seating configuration were very similar to those of Royals Stadium (now Kauffman Stadium) in Kansas City, which had been the last baseball-only park built in the majors, in 1973.Īs originally built, the park was criticized by many fans because of the height of the upper deck. The "exploding scoreboard" pays homage to the original, installed by Bill Veeck at the old park in 1960. The front facade of the park features arched windows. It was also the last one built before the wave of new " retro-classic" ballparks in the 1990s and 2000s.Ī few design features from the old Comiskey Park were retained. The stadium was the first new major sporting facility built in Chicago since Chicago Stadium in 1929. View from the upper deck during construction, September 1990 The spectator ramp across 35th Street is designed in such a way (partly curved, partly straight but angling east-northeast) that it echoes the contour of the old first-base grandstand. The location of Old Comiskey's home plate is represented by a marble plaque on the sidewalk next to Guaranteed Rate Field, with the foul lines painted in the parking lot. The stadium was built directly across 35th Street from the original Comiskey Park, which was demolished to make room for a parking lot for the new venue. Guaranteed Rate Field is situated just to the west of the Dan Ryan Expressway in Chicago's Armour Square neighborhood, adjacent to the more famous neighborhood of Bridgeport. Completed at a cost of US$137 million, the park opened as Comiskey Park on April 18, 1991, taking its name from the former ballpark at which the White Sox had played since 1910. It serves as the ballpark of the Chicago White Sox, one of the city's two Major League Baseball (MLB) teams, and is owned by the state of Illinois through the Illinois Sports Facilities Authority. Cellular Field is a baseball stadium located on the South Side of Chicago, Illinois, United States. Guaranteed Rate Field, formerly Comiskey Park and U.S. LED Ribbon Board, facade of the 500 level (2018–present) Right-center – 375 ft (114 m) (not posted)Ĩ,000 square foot Center field HD video board 60 feet (18 m) × 134 feet (41 m) (2016–present)Ģ,500 square foot auxiliary video boards in Right & Left Field (2016–present) Post-renovations: 41,432 (OctoWorld Series Game 2) After component A and B fully mixed, apply the mixture on the jointing tape using a notched trowel.Location in the United States Show map of the United StatesĤ1☄9′48″N 87☃8′2″W / 41.83000°N 87.63389°W / 41.83000 -87.63389Ĥ7,754 (SeptemChance the Rapper concert) In winter or low temperatures, stir and mix component A alone first, then add component B and complete the mixing process. You must ensure that both parts are sufficiently mixed. You can also mix the two parts manually, but that will take a longer time and more work. Pour component B (1kg) to component A (9 kg), and mix with a low-speed mixer, thoroughly mix both parts together, until a homogeneous and smooth mix is obtained. Recommend stirring 1-2 minutes. The components are already pre-measured: component B is contained in component A pack (Sometimes for safe shipping, we put 4 component B in a separate carton). How to mix component A and component B together? To achieve a full bond, the mixing ratio needs to be 9:1, so always use the entire amount of hardener supplied. The mixing ratio between the two components is 90:10 (9:1). The two-part adhesive consists of component A, a thick paste, and component B, a fluid hardener. It is primarily designed for bonding artificial grass carpets to seaming tape it produces a strong, invisible join. The two-component glue we provide is a water-free polyurethane adhesive. Actually, we provide white non-woven seaming tape for two-component glue. (Pictures above just for telling the method of using glue and joint tape to bond artificial grass. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |